Skip to content
Engineering Water. Powering Industry. Protecting Tomorrow.

Engineering pure water.Powering a better tomorrow.

Advanced industrial water treatment solutions engineered for performance, reliability and sustainability.

  • EST. 2018
  • 100 – 50,000 LPH
  • 5 – 100 TR
  • PAN-INDIA
0+Years of excellenceSince 2018
0+Successful installationsAcross India
Nationwide installation & commissioning
03Treatment sequence

From raw intaketo pure output.

The same water, in the order it actually travels the plant: intake, pre-treatment, membrane, control, output. Each stage is sized against the raw water analysis rather than a default configuration, so the train shown here is the sequence, not a promise about your site.

Stand-in artwork — awaiting A2Care site media05 stages · intake to output
  1. 01Intake

    Raw water arrives with everything in it.

    Borehole, municipal or surface supply reaches the plant carrying suspended solids, dissolved salts, hardness and whatever the catchment carries. Nothing is assumed — a raw water analysis sets the treatment train.

    Input
    Feed water
    Basis
    Raw water analysis
    Variable
    TDS · turbidity · hardness
  2. 02Pre-treatment

    The load is taken off before the membranes see it.

    Multi-media and sediment stages strip out the particulate that would otherwise foul downstream. This is where plant life is decided — membranes only stay inside their design window if what reaches them has been properly reduced.

    Stage
    Multi-media · cartridge
    Removes
    Suspended solids
    Protects
    Membrane stage
  3. 03Membrane

    Thin-film composite membranes do the separation.

    Pressurised across the membrane stack, water passes while dissolved salts are rejected and carried away to concentrate. Recovery ratio, flux and stage count are worked out from the feed water and the duty, not set to a default.

    Technology
    Thin-film composite
    Range
    100 – 50,000 LPH
    Set by
    Feed water quality
  4. 04Control

    The plant is watched, not just switched on.

    Conductivity, pressure and flow are read at the points that matter, with dosing held to the rate the system actually needs. Instrumentation is what turns a treatment plant into something an operator can trust through a production shift.

    Measured
    Conductivity · pressure · flow
    Dosing
    Antiscalant · pH · biocide
    Panel
    Manual to PLC
  5. 05Output

    Water that goes to work, on specification.

    Treated water is delivered to process, boiler feed or drinking duties at a quality held consistently. Where the site allows, reuse and harvesting arrangements close part of the loop before the water is ever discharged.

    Output
    To specification
    Duty
    Process · boiler · potable
    Loop
    Reuse where practical
ATreatment train

Water does notarrive treated.

Eight unit operations, in the order they usually appear. Select any stage to read what it does and why it sits where it does — the sequence is a map of what a plant has to accomplish, not a specification.

Process line — 8 stages

01 / 08

Select a node, or use the arrow keys — Home and End jump to the ends of the line.where applicable

Stage 01 of 08

Raw water inlet

Feed water enters the plant and is metered.

Incoming supply from borehole, municipal or surface source. Flow is measured here so everything downstream is sized against a known quantity, and the raw water analysis sets the train.

Entry point — everything downstream is sized from here

Where this sits

  • 01 Raw water inlet— selected
  • 02 Pre-treatment
  • 03 Sand filtration
  • 04 Activated carbon filtration
  • 05 Cartridge filtration
  • 06 RO membrane filtration
  • 07 UV treatment ·
  • 08 Treated water outlet

A middle dot marks a stage that appears only where the duty calls for it.

Read this before mapping your site onto it

The treatment configuration your plant needs varies with the quality of its feed water and the requirements of the project. Stages get skipped, added, repeated or reordered — a borehole carrying heavy hardness is not a municipal line with chlorine, and drinking water is not boiler feed. This diagram shows what a treatment train is made of. It does not size or specify yours.

A raw water analysis is what turns this into a design. A2Care works from that report, not from a diagram.

04The company

More than water treatment.We engineer water solutions.

A2Care India combines engineering expertise, advanced purification technology and practical industrial knowledge to help businesses operate efficiently and sustainably.

Established in 2018 and based in Rudrapur, Uttarakhand, the company stays with a project across its whole life — consultation, water quality analysis, engineering and design, manufacturing, installation, commissioning and maintenance. One engineering responsibility from the first raw water sample to the annual maintenance contract.

Design basis

Capacity, recovery and pre-treatment are worked out from a raw water analysis and the actual duty the plant has to hold — not picked from a catalogue.

Precision, reliability and system performance carry through fabrication and assembly — the stage where plant life is decided.

0+
Years of excellence
Since 2018
0+
Successful installations
Across India
0 LPH
Industrial RO capacity
From 100 LPH
0 TR
Industrial chiller range
From 5 TR
Established
2018
Base
Rudrapur, Uttarakhand
Scope
Engineer · Manufacture · Supply · Install · Maintain
Coverage
Pan-India installation and commissioning
05Solutions

7 solution families.Each one engineered to the site.

Reverse osmosis, effluent and sewage treatment, dosing, rainwater and process cooling — designed against feed water analysis and the duty the plant has to hold, then fabricated, installed and commissioned as one package.

Scope of supply

Engineer · Manufacture · Supply · Install · Maintain — across India.

100 LPH – 50,000 LPH
01Featured family

Industrial RO Plants

Customised industrial reverse osmosis systems engineered for high-capacity water purification.

  • Capacity range from 100 LPH to 50,000 LPH
  • Design driven by feed water analysis
  • Skid-mounted for faster installation
Learn more
Sized per outlet demand
02System family

Commercial RO Systems

Advanced purification solutions for commercial establishments, institutions and businesses.

  • Thin-film composite membrane technology
  • Compact footprint for plant rooms
Learn more
Sized to effluent load
03System family

ETP Plants

Effluent Treatment Plants designed to treat industrial wastewater and support regulatory compliance.

  • Designed around measured contaminant load
  • Configured to meet pollution control board norms
Learn more
Sized to sewage load
04System family

STP Plants

Sewage Treatment Plants designed for effective wastewater treatment and reuse.

  • Treated water available for non-potable reuse
  • Compact arrangements for constrained sites
Learn more
Sized to system duty
05System family

Chemical Dosing Systems

Precision chemical dosing solutions for industrial water systems, boilers and cooling towers.

  • Metering pumps matched to duty
  • Boiler and cooling tower applications
Learn more
Sized to catchment and rainfall
06System family

Rainwater Harvesting Systems

Sustainable rainwater collection, filtration and water conservation solutions.

  • Collection, filtration and storage
  • Groundwater recharge arrangements
Learn more
5 TR – 100 TR
07System family

Industrial Water Chillers

Industrial cooling systems with capacities from 5 TR to 100 TR.

  • Capacity range from 5 TR to 100 TR
  • Selected against measured heat load
Learn more

Recovery ratios, housing materials, instrumentation and control arrangements are configuration choices confirmed per project — specification sheets are issued with the design, not published as fixed values.

06Industries

Engineered for everyindustry that depends on water.

Every sector carries its own water pressures — what arrives, what the process demands and what leaves the site. These are the industries A2Care designs for, mapped to the treatment families each duty draws on.

Swipe the row · 10 industries

0103 families

Food & Beverage

Water that goes into a product has to be consistent, because it carries into taste, shelf life and compliance.

  • Process and ingredient water
  • Cleaning-in-place duty
  • Organic effluent load
0503 families

Chemical Manufacturing

The hardest effluent in most industrial regions, with loads that shift across the production cycle.

  • Variable contaminant load
  • Process water quality
  • Disposal norm compliance
07Projects

Real projects.Real engineering.Real impact.

Plants delivered for food processing, chemical, refinery, institutional and manufacturing duty — reverse osmosis, effluent and sewage treatment, and industrial chilling across Uttarakhand and Uttar Pradesh.

Showing 8 of 8 projects

RO Plants

A 5,000 LPH industrial reverse osmosis plant serving a food processing unit at Pantnagar, delivered end to end by A2Care India.

5000 LPH Industrial RO Plant

Food processing unitFood & Beverage

Pantnagar, UttarakhandIndustrial Reverse Osmosis5,000 LPHCompleted January 2026
ETP

A 50 KLD effluent treatment plant for a chemical manufacturing unit at Rudrapur.

50 KLD ETP Plant

Chemical manufacturerChemical Manufacturing

Rudrapur, UttarakhandEffluent Treatment Plant50 KLDCompleted December 2025
Industrial Chillers

A 20 TR industrial water chiller supporting a plastic molding operation at Haldwani.

20 TR Industrial Water Chiller

Plastic molding unitIndustrial Manufacturing

Haldwani, UttarakhandIndustrial Water Chiller20 TRCompleted November 2025
RO Plants

A 1,500 LPH reverse osmosis system installed at St. Peter Senior Secondary School, Kichha.

1500 LPH RO Plant

St. Peter Senior Secondary SchoolEducational Institutions

Kichha, UttarakhandCommercial Reverse Osmosis1,500 LPH
RO Plants

A 250 LPH reverse osmosis plant supplying purified process water to Hare Krishna Gold Refinery, Haridwar.

250 LPH Gold Refinery RO Plant

Hare Krishna Gold RefineryChemical Manufacturing

Haridwar, UttarakhandReverse Osmosis250 LPH
RO Plants

A second, higher-capacity 500 LPH RO plant delivered to Hare Krishna Gold Refinery at Haridwar.

500 LPH Gold Refinery RO Plant

Hare Krishna Gold RefineryChemical Manufacturing

Haridwar, UttarakhandReverse Osmosis500 LPH
STP

A 2,000 LPD sewage treatment plant installed at a site near Jewar Airport in Gautam Buddha Nagar.

Sewage Treatment Plant Installation

Site near Jewar AirportInfrastructure & Construction

Near Jewar Airport, Gautam Buddha Nagar, Uttar PradeshSewage Treatment Plant2,000 LPD
RO Plants

A 500 LPH water treatment plant serving battery-grade water duty for Paras Minerals Water, Haldwani — the capacity is the client’s own published description of the installation.

Battery Water Plant

Paras Minerals WaterIndustrial Manufacturing

Haldwani, UttarakhandWater Treatment Plant500 LPH
08Clients

Trust built throughevery installation.

Supporting businesses, institutions, and industrial operations with dependable water treatment solutions.

St. Peter Senior Secondary School

RO plant · Kichha

Hare Krishna Gold Refinery

RO plants · Haridwar

Paras Minerals Water

Water plant · Haldwani

St. Peter Senior Secondary School

1500 LPH RO Plant · Kichha, Uttarakhand

Hare Krishna Gold Refinery

250 LPH RO Plant · Haridwar, Uttarakhand

Sewage treatment installation

STP Plant · Near Jewar Airport, Gautam Buddha Nagar

Paras Minerals Water

Battery Water Plant · Haldwani, Uttarakhand

These are typographic wordmarks, not logos. Client marks and brand assets are published only when supplied with written authorisation from each organisation — until then, the names behind these installations stand on their own.

09Why A2Care

The engineering partnerbehind better water.

Six things that should hold on every water project, described by how the work is actually done — from analysis and design through fabrication, installation and the support that follows handover.

01

Custom engineering

Solutions tailored to water quality, capacity and application requirements — designed from analysis rather than selected from a list.

02

Advanced technology

Modern filtration and purification technologies, from thin-film composite membranes to instrumented control.

03

Quality manufacturing

A focus on precision, reliability and system performance through fabrication and assembly.

04

End-to-end execution

Support across consultation, manufacturing, installation and commissioning under one engineering responsibility.

05

Pan-India service

Project execution and technical support across India, from the Rudrapur base in Uttarakhand.

06

After-sales support

Maintenance, annual maintenance contracts and technical assistance after handover.

The clearest read on any of this is commissioned plant — duties taken from raw water analysis through to handover and support.

10How we work

From water challengeto engineered solution.

Six stages between the first conversation and a plant that is still performing years after handover. Each one produces something concrete — not a milestone slide.

  1. Stage 01

    Consultation

    The requirement is established in operational terms — what the water is for, how much, how continuously, and what constraint would make a system fail.

    Deliverable — Requirement and site brief

  2. Stage 02

    Water Quality Analysis

    Feed water is analysed so the treatment train is designed against measured quality instead of assumption.

    Deliverable — Raw water report

  3. Stage 03

    Engineering & System Design

    Process configuration, capacity, instrumentation and layout are worked out, then priced as a defined scope.

    Deliverable — Design and quotation

  4. Stage 04

    Manufacturing

    Systems are fabricated with attention to materials, assembly and the accuracy of the build — the stage where reliability is decided.

    Deliverable — Fabricated plant

  5. Stage 05

    Installation & Commissioning

    Plant is installed on site, connected, set to duty and proved against the specification it was engineered to.

    Deliverable — Commissioned system

  6. Stage 06

    Maintenance & Support

    After-sales support, maintenance and annual maintenance contracts keep performance where it was handed over.

    Deliverable — Ongoing support and AMC

11Sustainability

Better water management.A more sustainable future.

Water is not a line — it is a loop. Intake, duty, treatment, return. Every plant A2Care engineers is planned around closing that loop: taking only what the process needs, holding what it uses to specification, and giving water back to the environment it came from on terms the site can answer for.

01 · IntakeWater drawn to a measured duty
02 · TreatmentEngineered to prove specification
03 · ReturnHeld to norms before it leaves site

Water conservation

Treatment is sized to demand so capacity is not built, and run, beyond what the process needs.

Wastewater treatment

Effluent and sewage are treated to applicable norms before they leave the site.

Water reuse

Treated output is routed back into non-potable duty — landscaping, flushing, cooling — instead of being discarded.

Rainwater harvesting

Catchment, filtration, storage and recharge reduce dependence on groundwater and municipal supply.

Responsible management

Industrial water is managed as a loop: intake, duty, treatment and return, planned together.

Efficient system design

Recovery, dosing and control are configured to hold specification without wasting energy or chemistry.

Measured environmental claims are published only once the company verifies them. What is stated here is how the work is engineered.

12In their words

Trusted by the peoplewho depend on us.

Every statement below is quoted exactly as the customer gave it. Nothing sharpened, nothing invented.

The water quality is excellent, and their after-sales support is outstanding.
Fr. Alexander MonteiroSt. Peter Senior Secondary School1500 LPH RO Plant · Kichha, Uttarakhand
13FAQ

Questions we are askedbefore a plant is designed.

Capacity ranges, installation coverage, maintenance and norms — the questions that shape a treatment train before anything is quoted.

Your question depends on your feed water and your duty. The engineering team answers that directly — send the raw water report and the required capacity, and the response comes back with the design thinking behind it.

A2Care India engineers industrial reverse osmosis plants from 100 LPH up to 50,000 LPH. Capacity is fixed against your hourly process demand and a raw water analysis, not chosen from a catalogue.

Yes. A2Care handles installation and commissioning nationwide, from the headquarters at Rudrapur in Uttarakhand to sites across other states, including Uttar Pradesh projects around Gautam Buddha Nagar and Haridwar.

Delivery depends on plant type, capacity and how much site preparation runs in parallel, so a firm timeline is confirmed with the quotation against your specific scope rather than quoted generically.

Yes. Maintenance and annual maintenance contracts form part of A2Care’s after-sales support alongside technical assistance, so a plant keeps performing after commissioning rather than at it.

Warranty terms are set out with the offer for your system, since coverage differs between the plant package and its wear components. Ask the team and the applicable terms come back with your quotation.

Yes. Effluent and sewage treatment trains are configured against the norms applicable to the site and industry, working from the effluent characteristics recorded during analysis.

Use the project enquiry form, call +91-9336432885 or +91-7017572336, or message on WhatsApp. Send a raw water report and your required capacity with the enquiry and the engineering response is quicker.

Food and beverage, pharmaceutical, healthcare, educational institutions, chemical manufacturing, textile manufacturing, hospitality, commercial buildings, industrial manufacturing, and infrastructure and construction.
Start the engineering conversation

Let’s engineer yournext water solution.

Tell us about your water treatment requirements. Our team will help you find the right engineering solution.

15Contact

Send the requirement.Get an engineering answer.

Every project starts from the same two facts: what the water has to do, and what is coming out of the ground today. Put both in the form — it posts to this site's own enquiry endpoint — or use the published channels below.

Office & works
M84 Matkota Farm, Near PNB Bank
Rudrapur, Uttarakhand, India
263153
WhatsApp
Message A2Care IndiaOpens with a first line already typed in, so the team knows it came from this page.
Business hours
Monday – Saturday, 9:00 AM – 6:00 PMSunday closed. The form accepts submissions any time; replies happen during the hours above.
Open in Google Maps

M84 Matkota Farm, Near PNB Bank, Rudrapur, Uttarakhand, India - 263153

A2Care India — Rudrapur, Uttarakhand
Open in Google Maps

Project enquiry

Fields marked * are required

Optional — useful if you are enquiring for a site.

Mobile, or landline with its area code.

Where the plant or system will be installed.

Ranges shown are the ones A2Care publishes; anything else is worked out from your water.

0 / 4000

Sent directly to A2Care India — no third-party form service in between.

Prefer to talk it through first? +91-9336432885 reaches the Rudrapur office during business hours. Published ranges are on the products page, and the solutions overview explains how each duty is approached.