Skip to content
Solutions

More than water treatment.
We engineer water solutions.

At A2Care India, engineering expertise, advanced purification technology and practical industrial knowledge are combined into solutions that help businesses operate efficiently and sustainably — from the raw water report to the maintenance contract.

Engagement model

Consult · Analyse · Design · Manufacture · Install · Maintain

01Duty one

Get the waterto specification.

Feed water is analysed, then a train is arranged to hold the required quality continuously — not to hit a number on a datasheet once at commissioning.

100 LPH – 50,000 LPH
01System family

Industrial RO Plants

Customised industrial reverse osmosis systems engineered for high-capacity water purification.

  • Capacity range from 100 LPH to 50,000 LPH
  • Design driven by feed water analysis
Learn more
Sized per outlet demand
02System family

Commercial RO Systems

Advanced purification solutions for commercial establishments, institutions and businesses.

  • Thin-film composite membrane technology
  • Compact footprint for plant rooms
Learn more
Sized to system duty
03System family

Chemical Dosing Systems

Precision chemical dosing solutions for industrial water systems, boilers and cooling towers.

  • Metering pumps matched to duty
  • Boiler and cooling tower applications
Learn more
Sized to catchment and rainfall
04System family

Rainwater Harvesting Systems

Sustainable rainwater collection, filtration and water conservation solutions.

  • Collection, filtration and storage
  • Groundwater recharge arrangements
Learn more
02Duty two

Take the loadout of the wateryou send back.

Effluent and sewage are the difficult streams: variable load, regulated output, and the best sites turn the treated volume back into use instead of discharging it.

Sized to effluent load
01System family

ETP Plants

Effluent Treatment Plants designed to treat industrial wastewater and support regulatory compliance.

  • Designed around measured contaminant load
  • Configured to meet pollution control board norms
Learn more
Sized to sewage load
02System family

STP Plants

Sewage Treatment Plants designed for effective wastewater treatment and reuse.

  • Treated water available for non-potable reuse
  • Compact arrangements for constrained sites
Learn more
03Duty three

Hold thetemperature.

Cooling duty follows the process, not the nameplate. Chillers are selected against measured heat load and the water they will actually run on.

5 TR – 100 TR
01Featured family

Industrial Water Chillers

Industrial cooling systems with capacities from 5 TR to 100 TR.

  • Capacity range from 5 TR to 100 TR
  • Selected against measured heat load
  • Water-cooled and air-cooled arrangements
Learn more
ATreatment train

Water does notarrive treated.

Eight unit operations, in the order they usually appear. Select any stage to read what it does and why it sits where it does — the sequence is a map of what a plant has to accomplish, not a specification.

Process line — 8 stages

01 / 08

Select a node, or use the arrow keys — Home and End jump to the ends of the line.where applicable

Stage 01 of 08

Raw water inlet

Feed water enters the plant and is metered.

Incoming supply from borehole, municipal or surface source. Flow is measured here so everything downstream is sized against a known quantity, and the raw water analysis sets the train.

Entry point — everything downstream is sized from here

Where this sits

  • 01 Raw water inlet— selected
  • 02 Pre-treatment
  • 03 Sand filtration
  • 04 Activated carbon filtration
  • 05 Cartridge filtration
  • 06 RO membrane filtration
  • 07 UV treatment ·
  • 08 Treated water outlet

A middle dot marks a stage that appears only where the duty calls for it.

Read this before mapping your site onto it

The treatment configuration your plant needs varies with the quality of its feed water and the requirements of the project. Stages get skipped, added, repeated or reordered — a borehole carrying heavy hardness is not a municipal line with chlorine, and drinking water is not boiler feed. This diagram shows what a treatment train is made of. It does not size or specify yours.

A raw water analysis is what turns this into a design. A2Care works from that report, not from a diagram.

04Delivery

One responsibility,start to service.

The same team that specifies the train fabricates it, commissions it and answers the phone afterwards. That continuity is where reliability is won.

  1. 01

    Consultation

    The requirement is established in operational terms — what the water is for, how much, how continuously, and what constraint would make a system fail.

    Requirement and site brief
  2. 02

    Water Quality Analysis

    Feed water is analysed so the treatment train is designed against measured quality instead of assumption.

    Raw water report
  3. 03

    Engineering & System Design

    Process configuration, capacity, instrumentation and layout are worked out, then priced as a defined scope.

    Design and quotation
  4. 04

    Manufacturing

    Systems are fabricated with attention to materials, assembly and the accuracy of the build — the stage where reliability is decided.

    Fabricated plant
  5. 05

    Installation & Commissioning

    Plant is installed on site, connected, set to duty and proved against the specification it was engineered to.

    Commissioned system
  6. 06

    Maintenance & Support

    After-sales support, maintenance and annual maintenance contracts keep performance where it was handed over.

    Ongoing support and AMC
Solutions are engineered from Rudrapur, Uttarakhand and commissioned on site across India. Reach the team on +91-9336432885 or +91-7017572336.